Skip to the bench
Sawmill Steel Co.

Steel cut in Greenfield, set across New England

The bench notes

The bench notes

Every check the shop writes down: what we measured, on which job, against which spec, and what the note does not cover.

  1. mark1B-04 benchFrom the shop checked

    What the mill certificate tells you before the first cut

    A mill certificate read at the bench before the saw: heat number, ASTM grade, yield and tensile, and what the paper does not prove about the plate under it.

    6 min read

    A steel mill certificate sheet lying on a steel plate in a fabrication shop with a caliper beside it.
  2. mark1B-03 benchFrom the shop checked

    What the cut edge says about the pass that made it

    Top edge rounding, dross on the bottom, a few degrees of bevel and the kerf: what a plasma-cut edge records about the pass that made it, read at the bench.

    6 min read

    A close view of a plasma-cut edge on a steel plate showing the cut line and slight bevel.
  3. mark2B-04 benchFrom the field checked

    Squaring a bay by the tape: what the diagonals said

    Two pulls of a 100 ft tape across one bay, the two numbers written side by side, and the difference that decides whether the deck goes on today.

    6 min read

    An ironworker measuring the diagonal of a steel bay with a long tape on a construction site.
  4. mark1B-02 benchFrom the shop checked

    The fit-up check that happens before the weld goes in

    Root opening, bevel, root face and hi-lo, read with a taper gauge, a protractor and a caliper on one groove joint, with the numbers as they came off the bench.

    6 min read

    A welder checking the gap between two beveled steel plates with a taper gauge before welding.
  5. mark3B-03 benchProjects checked

    A school gym frame in six working days: the sequence

    Six working days, one crane, and a southern New Hampshire school gym: the shake-out, the pick sequence, and the check values written on the back of a plan.

    6 min read

    A steel gymnasium frame under construction with a crane lifting a beam against a blue New England sky.
  6. mark2B-03 benchFrom the field checked

    When the anchor bolts do not line up: what gets measured first

    A base plate that will not go down over four anchor rods on a hospital wing addition: what gets measured first, in what order, and what the tape read.

    6 min read

    A steel base plate on a concrete foundation with anchor bolts and a measuring tape laid across it.
  7. mark1B-01 benchFrom the shop checked

    Coping beams so they bolt up in the air, not on the phone

    A cope gets cut and checked on the bench: cut dimensions, the clearance to the supporting member, the gage line on the angle, and what the tape cannot prove.

    6 min read

    A steel beam end with a cope cut resting on a fabrication shop workbench with layout marks visible.
  8. mark4B-03 benchSteel notes checked

    Shop weld or field weld: what the drawing actually says

    Bench check on a weld callout: where the symbol puts the weld, what the field flag changes, and what the crew does when the drawing and habit disagree.

    6 min read

    A welding detail drawn on a shop drawing sheet with a steel assembly in the background.
  9. mark2B-02 benchFrom the field checked

    Decking in a Northeast wind: the pattern the crew checks twice

    A bench note on setting metal deck when the forecast calls for gusts: how bundles get staged, the side-lap and fastening pattern check, and when the crew calls it.

    6 min read

    Corrugated metal decking sheets being placed on a steel frame with a worker fastening them, trees bending in wind behind.
  10. mark2B-01 benchFrom the field checked

    The torque check on an A325 connection: what it verified

    Turn-of-nut marks, a DTI squirt and a torque wrench walked onto a bearing frame: what the bolt check on two steel jobs verified, in the order it was read.

    6 min read

    A worker using an impact wrench on a bolted steel connection plate on a building frame.
  11. mark3B-02 benchProjects checked

    Steel over a corridor that stayed open: how the picks were sequenced

    A school wing addition picked over a corridor that never closed: the pick radii, the flag line and the hour-by-hour window plan, read off the rigging sheet.

    6 min read

    A steel beam being lifted by a crane next to an occupied brick institutional building.
  12. mark3B-01 benchProjects checked

    Stairs and rails for a town library: the measure that decides everything

    A finish-metal note from the shop: the field measure, the 42 in guard height, the 4 in sphere, and the one dimension on a library stair that had to be cut twice.

    6 min read

    A new steel stair with black metal railings inside a bright public building lobby.
  13. mark4B-02 benchSteel notes checked

    Winter steel in New England: what the cold actually does to a job

    Cold steel, condensation and the calendar: what a New England winter does to fabrication and erection, measured on the bench and read against the drawings.

    6 min read

    A steel fabrication yard in winter with frost on stacked steel beams and snow on the ground.
  14. mark4B-01 benchSteel notes checked

    Read the shop drawing before you cut: the five minutes that save the afternoon

    Piece marks, material callouts, camber notes and general notes, read at the bench before the saw starts, with the readings and the lines they came from.

    6 min read

    A shop drawing spread on a steel worktable with a steel rule and a carpenter pencil on top.